Requirements and Lead Times for Secondary Operations

 

Operation Required Inputs Lead Time
Mold Texturing/Engraving

Texturing
2D drawing/image with faces to be textured
Desired texture (e.g., MT 11010)

Engraving
CAD with the text or graphics to be engraved modeled into the part on location and at desired depth

+9 days for molds
Pad Printing
  • 2D drawing noting location of graphics
  • Adobe Illustrator file of the text/graphics to be printed
  • Material: Only ABS, PC, ABS/PC are available

+5 days (repeat order)

+10 days (first order)

UV Printing
  • 2D drawing noting location of graphics
  • Adobe Illustrator file of the text/graphics to be printed
  • Material: Only ABS, PC, ABS/PC, PMMA, PA

+5 days (repeat order)

+10 days (first order)

Threaded Inserts 2D drawing noting insert type and location

+5 days (repeat order)

+10 days (first order)

Laser Engraving

CAD with text or graphics to be engraved modeled into the part on location and at zero depth

+5 days for parts
Part Cleaning PDF printout of the section outlining detailed cleaning and packaging requirements +12 days
Packaging
  • Clear instructions for packaging, assembly, and/or machining (see assembly evaluation template)
  • Part quantity
+6 days
Assembly
  • Clear instructions for packaging, assembly, and/or machining (see assembly evaluation template)
  • Part quantity
+6 days
Machining
  • Clear instructions for packaging, assembly, and/or machining (see assembly evaluation template)
  • Part quantity